Astro, Bukit Jalil — VRV Installed Under Daikin's Own Inspection

Ten indoor units on two condensing units — installed by CASS, then independently inspected and commissioned by Daikin Malaysia.

Client

A national Malaysian broadcaster, at its Technology Park Malaysia campus in Bukit Jalil, Kuala Lumpur. Office and meeting-room areas.

Challenge

A corporate office floor requires independent zone control across meeting rooms and open office areas that are occupied on different schedules, delivered within a working media-company campus. VRV was specified to provide multi-zone control from consolidated outdoor plant.

Solution

A Daikin VRV A system: two condensing units — one 12HP master (RXQ12AYM) and one 10HP slave (RXQ10AYM) — serving ten indoor fan-coil units (eight FXFQ50AVM, two FXFQ63AVM) across all served areas.

Execution

Installed and commissioned by CASS as appointed Daikin installer, with Daikin Malaysia conducting independent installation-quality inspection and witnessing testing and commissioning on site.

Commissioning was documented to Daikin's VRV Installation Quality Management standard, with recorded operating data captured per condensing unit: suction and discharge pressures, ambient and pipe temperatures, three-phase running amperage, supply voltage, and additional refrigerant charge (9.5 kg).

Evidence

  • Daikin VRV A system — 2 condensing units, 10 indoor fan-coil units
  • Independently inspected and commissioned by Daikin Malaysia, December 2022
  • Documented commissioning data retained per condensing unit: pressures, temperatures, three-phase amperage, voltage, refrigerant charge
  • Delivered at a national broadcaster's operating corporate campus

Outcome

A commissioned Daikin VRV installation at a national broadcaster's campus, delivered under manufacturer inspection.

On site

  • A Daikin VRV condensing unit standing on its plinth with charging equipment connected alongside.
    Daikin VRV condensing unit during charging
  • Two insulated refrigerant risers running floor to ceiling in a service shaft, clipped at regular intervals.
    Refrigerant risers in the service shaft
  • A ceiling cassette set flush into a suspended office ceiling beside a window line.
    Cassette set into the finished office ceiling
  • A wall-mounted Daikin control panel with touchscreen interface and flexible conduit runs.
    Central control panel — the interface the operating data is read from

This project was delivered under Commercial HVAC Projects.

Have a similar requirement?

Tell us the building, the scope and the timeline, and you will reach the team that handles this kind of work.

WhatsApp: Discuss Your Project

→ wa.me/60125923829 (Stefan, Commercial Projects)