Airport Administrative Facility — Delivered as HVAC Subcontractor Under a Permit-to-Work Regime

Mixed ducted-and-cassette architecture for a board room and dining hall, delivered to a main contractor's programme on a controlled-access site.

Client

A Malaysian airport operator's administrative facility. Delivered by CASS as HVAC subcontractor to the appointed main contractor.

Challenge

Administrative and staff facilities at an operating airport campus — a board room and a staff dining hall — required full air-conditioning replacement. Two constraints shaped the work.

Access is controlled. Airport premises operate under a formal permit-to-work regime: approved method statements, insurance, certified personnel, PPE, and site-specific certification before any work begins. Scheduling is granted, not chosen.

The load is high for the floor area. A board room and a dining hall both carry high occupancy density in short bursts, and both require quiet operation — a board room in particular cannot have audible equipment noise during use.

Solution

A combined system architecture per room rather than a single unit type:

  • Board room — one 10.0HP high-static ducted unit (100,000 Btu/hr) providing the primary ducted distribution, supplemented by two 5.0HP ceiling cassettes (48,000 Btu/hr each). Ducted distribution keeps equipment out of sight and noise away from the room.
  • Dining hall — one 8.0HP high-static ducted unit (80,000 Btu/hr) plus one 5.0HP ceiling cassette.

Execution

Ducted units carry the base load quietly through the ceiling void; cassettes handle peak occupancy. All Daikin, as authorised dealer. Scope extended well beyond unit replacement:

  • Existing systems dismantled and removed
  • New insulated copper distribution with SIRIM-certified control wiring throughout
  • Electrical infrastructure upgraded — new ACSU distribution board, 16mm² SIRIM-certified incoming supply, 4mm² supply per unit
  • Builder's works — wall hacking, patching, drilling, painting, and a 24"×24" access manhole formed for ceiling-void service access
  • Crane/skylift mobilised for outdoor plant placement at a high-rise elevation
  • Permit-to-work package — application, insurance, transportation, PPE and required certification, priced and delivered as a distinct scope item

Evidence

  • Airport administrative facility — board room and staff dining hall
  • Delivered as HVAC subcontractor to the appointed main contractor
  • Mixed system architecture — high-static ducted for base load and acoustic control, ceiling cassette for peak occupancy; ~196,000 and ~128,000 Btu/hr respectively
  • Formal permit-to-work regime — approved method statement, insurance, certified personnel, PPE, site certification
  • Electrical infrastructure delivered alongside: ACSU DB board, 16mm² submain
  • Crane-assisted high-rise outdoor plant installation
  • Completed July 2025

Outcome

A completed HVAC replacement at an airport administrative facility, delivered under a controlled-access permit regime through the appointed main contractor.

On site

  • A long board room with a single conference table, ceiling cassettes set into the acoustic ceiling above.
    Board room — replacement plant set into the finished ceiling
  • A staff dining and meeting area with round tables and ceiling-mounted units above.
    Staff dining hall, the second of the two areas in scope
  • Condensing units installed on a roof deck above the administrative building.
    Condensing plant on the roof deck
  • A technician working at a larger condensing unit on the roof deck.
    Roof-deck plant — access under the site's permit-to-work regime

This project was delivered under Commercial HVAC Projects.

Have a similar requirement?

Tell us the building, the scope and the timeline, and you will reach the team that handles this kind of work.

WhatsApp: Discuss Your Project

→ wa.me/60125923829 (Stefan, Commercial Projects)