朱光玉火锅馆 — Four Outlets, Three States, Every Opening Date Held

Four hotpot outlets across three states, zoned for a dining room where every table is a live heat source.

Client

朱光玉火锅馆 (Zhu Guang Yu Hot Pot) — a leading Chinese hotpot brand, expanding into Malaysia through a Malaysian holding partner.

Challenge

Hotpot is the most demanding comfort environment in commercial F&B. Every table is a live heat source: induction or gas burners running continuously beneath diners, plus steam, plus a full commercial kitchen behind.

Cooling that fights a dining room full of active burners is not a floor-area calculation — it is a heat load problem where getting the zoning wrong produces a dining hall that is simultaneously too cold at the perimeter and unbearable at the centre.

Compounding it: a brand rolling out multiple outlets nationally needs the same guest experience in every location, in buildings that differ completely in shape, ceiling height, and services access — and every outlet has a fixed opening date.

Solution

CASS was appointed HVAC design-and-build contractor across the brand's Malaysian outlet programme, delivering four outlets across three states: Kuala Lumpur (Pudu), Klang (Selangor), and Johor Bahru.

System design was zoned by function rather than applied uniformly — higher-capacity ceiling cassettes over dining halls carrying the burner load, separate units per VIP and private dining room for independent control, dedicated provision for kitchen, canteen, dishwash and cold-store areas, and wall-mounted units where cassette installation was not appropriate.

Execution

Each outlet was delivered to the brand's opening schedule, with scope covering equipment supply, installation, copper piping and SIRIM-certified control wiring, insulated condensate drainage, and cable tray systems. Variation orders were absorbed mid-project as layouts evolved — outdoor dining areas, additional dining zones, store rooms, and dishwash areas added without displacing the opening date.

The Johor Bahru outlet was executed as an outstation deployment: crews accommodated on site for the duration, crane and lifting equipment mobilised, and the full installation completed away from the Klang Valley base.

Evidence

  • Four outlets delivered across three states — KL, Selangor, Johor
  • Multi-outlet programme sustained from 2025 into 2026
  • Zoned system design per outlet: dining halls, VIP rooms, kitchen, canteen, cold store
  • Outstation delivery capability proven — crews, accommodation, crane, full install
  • Mid-project variation orders absorbed without moving opening dates
  • Daikin equipment throughout, as authorised dealer

Outcome

A repeat outlet-rollout relationship: once the first outlet's system design was proven, subsequent openings became execution problems rather than design problems — which is what allows a multi-outlet operator to hold opening dates.

On site

  • The 朱光玉火锅馆 outlet on Jalan Pudu, Kuala Lumpur, lit at night.
    Kuala Lumpur (Pudu) outlet
  • The 朱光玉火锅馆 outlet in Klang, Selangor, seen from the forecourt.
    Klang, Selangor outlet
  • The 朱光玉火锅馆 outlet in Johor Bahru at night, under its illuminated frontage.
    Johor Bahru outlet — delivered as an outstation deployment
  • A ceiling cassette mounted into a coffered ceiling during fit-out, still in its factory wrapping.
    Pudu, during fit-out — cassette set into the ceiling coffer, insulated drainage and cable tray run above
  • A ceiling cassette suspended from the structural slab with ducting and drainage routed to it.
    Pudu, during fit-out — unit hung off the slab before the ceiling closes
  • A wrapped ceiling cassette in position among ceiling framing and services.
    Pudu, during fit-out — dining-hall unit in position among the ceiling framing
  • A shophouse rear elevation carrying rows of outdoor condensing units on wall brackets across several storeys.
    Pudu — outdoor plant ranked up the rear elevation
  • A ceiling cassette still in its protective wrapping, fitted above a dining room during fit-out.
    Cassette in and wrapped, ahead of the ceiling closing
  • A finished dining room with a ceiling cassette set into the ceiling above the seating.
    The finished dining room — capacity set against the burner load beneath
  • A VIP dining room with its own ceiling cassette, independently controlled.
    VIP room on independent control, per the zoning strategy

This project was delivered under HVAC Design & Build.